Visitor Management System for Factories
للمصانع الدولية والمحلية التي تعمل بمعايير سلامة عالمية: النظام يربط الدخول بالتدريب والاختبار ووثائق المقاول، ويعطي حصرًا لحظيًا لكل من في المصنع.
Overview in English
Safety-first visitor control for plants
Factories need more than a visitor log. Every visitor, contractor and driver entering the plant should be inducted, approved and accounted for. The system makes safety video, quiz and signed declarations a condition for issuing a pass.
Truck gates use ANPR where available, contractors are tied to their company, contract and work area, and a live headcount by zone is available at any moment for emergency response.
- Safety video and quiz before pass issue
- PPE and restricted area instructions
- Contractor document expiry and auto-suspension
- Truck and driver linking with delivery slots
- Zone-based access with turnstile integration
- Live headcount and muster point check-in
من البوابة إلى خط الإنتاج
Induction
الفيديو والاختبار.
Approval
المستضيف والسلامة.
Gate
QR والهوية.
Zone
صلاحية المنطقة.
Headcount
في الحصر حتى الخروج.
أسئلة شائعة عن النظام للمصانع
Yes, per site and per language.
Yes, each plant is a site with its own rules and a group-level view.
Integration depends on your access control system; we assess it during the technical review.
Book a plant-focused demo / احجز عرضًا للمصانع
نعرض سيناريو مصنعك بالإنجليزية أو العربية.